KII Business OS: Client Requirements and Roadmap
Proposal and SOWData Management PlanDownload PDF
Agency MIOSA
Prepared for KII / October 6, 2026

KII business OS / Operations first

Make the first 90 days executable, Operations first.

This document turns the proposed engagement into the decisions, access, source material, named owners, and acceptance evidence KII and the delivery team need before implementation starts. Fill it in before kickoff and confirm it in the first Friday review.

WHAT KII PROVIDES

People, access, and real work

One named owner per decision, read-only access to the current systems, a small set of representative Operations examples, a data center environment for the install, and a 30-minute interview slot per team member.

WHAT AGENCY MIOSA PROVIDES

Delivery, governance, and handover

The foundation installed on KII infrastructure, the Operations vertical slice, Microsoft Teams integration via Microsoft Graph, documentation and runbooks, admin training, and full source handover in KII's own repository by Day 90.

How this document is used: KII completes the owner table, the access table, and the policy inputs before kickoff. Agency MIOSA converts the confirmed answers into the environment plan, the access plan, and the acceptance checks for each milestone.
ON-SITE

One week in Zurich

Included in the price, with travel and lodging covered by Agency MIOSA.

RHYTHM

Friday review

A 30 to 60 minute review, a written weekly status, and recorded decisions.

OWNERSHIP

KII owns the platform

Source, modules, configuration, and documentation live in KII's own repository.

02  Named owners before kickoff
06  Department sequence
03  Systems and access
07  Security and policy inputs
04  Representative Operations examples
08  Kickoff gate and confirmation
05  Roadmap, Day 0 to Day 90
Agency MIOSA
Prepared for KII / October 6, 2026

Named owners before kickoff

Every decision has one accountable person, not a committee.

Name the person who owns each decision. Where a decision needs a second signature, the second signature is confirmation, not a second owner. Owners are needed by Day 0 unless the table states otherwise.

RoleDecidesName (fill in)Needed by
Executive sponsorConfirms scope, milestone acceptance, and any change to dates. Day 0
Engineering evaluatorReviews the architecture, integration approach, and technical acceptance. Day 0
Business and budget ownerApproves the commercial schedule, invoices, and any scope change. Day 0
Operations ownerOwns the Operations pilot, the workflows, and daily user acceptance. Day 0
Security and data ownerApproves access methods, data handling, and the Data Management Plan. Day 0
Teams and Microsoft 365 adminGrants Microsoft Graph access and confirms tenant policy for the integration. Day 10
Data center and infrastructure ownerApproves the install environment, the network path, and the internal model endpoint. Day 10
Escalation: any blocked access or policy decision goes to the named owner with a written 24-hour response path. Agency MIOSA records the ruling in the decision log.
Schedule rule: a delay in these client decisions moves the affected milestone. The delivery team will not invent authority, data meaning, or acceptance criteria to preserve a date.
Agency MIOSA
Prepared for KII / October 6, 2026

Read-only mirror, the current tools keep running

Connect the current systems without disrupting live operations.

Agency MIOSA reads from the current systems through a mirror layer. Nothing writes to a production system without the approval of an authorized KII role. Access type is stated for each system.

SystemWhat we needAccess typeOwnerReady
AutotaskAccounts, contracts, tickets, and time entries for the Operations mirror.Read-only mirror □
KII ERP (in progress)Current schema, APIs, and a staging environment as it replaces Autotask.Read-only mirror, API □
TicketingTicket sources, status fields, priority rules, and escalation paths.Read-only mirror □
Time billingTime entries and billing rules tied to tickets and cases.Read-only mirror □
Microsoft Teams via Microsoft GraphGraph application access to meetings and channels, with tenant consent.Microsoft Graph API □
RepositoriesRead access to current code, then a KII-owned target repository for the fork.Read, then admin on KII repo □
DocumentationExisting documentation as it stands, so it is reused and completed, not rewritten.Read-only □
Internal RAGCurrent retrieval setup, sources, and embedding approach for reuse.Read-only, API □
vLLM endpoint and modelEndpoint details and the model name that serves operations.API □
Data center environmentTarget hosts, network path, storage, and a service account for the install.Admin, install □
Accounting systems (later)Read-only integration in a later phase. Migration is out of scope for these 90 days.Read-only, later phase □
Do not send by email: production secrets, shared administrator credentials, or unredacted client data. Credentials are exchanged through KII's approved method and stored under the Data Management Plan.
Agency MIOSA
Prepared for KII / October 6, 2026

Measure the system against real work

Prepare a small set of real examples, then confirm the expected result.

SIGNALS
  • A set of real signals from client environments
  • Expected classification and routing for each
  • Known duplicates and ambiguous cases
  • Thresholds for an urgent signal
TICKETS
  • Open and closed tickets across priorities
  • Examples of priority changes
  • Escalation and handover examples
  • Expected status at each step
CASES
  • Representative cases with owner and history
  • Resolution notes and linked tickets
  • At least one case that went wrong
  • Expected summary for each case
TIME ENTRIES
  • Time entries tied to tickets and cases
  • Billing rules and rounding
  • Examples that are unclear or disputed
  • Expected billing output
A HANDOVER EXAMPLE
  • One task that moves from one person to another
  • The context each person needs
  • Where the context currently lives
  • What full context would include
A CLIENT REPORT
  • One periodic report KII sends to a client
  • Source data and manual steps
  • Review and approval before sending
  • Expected content and layout
How these are handled: examples are read through the mirror layer, stay on KII infrastructure, and are governed by the Data Management Plan. If KII stops after the Operations pilot, KII keeps everything delivered to that point and Agency MIOSA disposes of KII data as the plan states.
Acceptance attributeWhat KII confirmsOwner
CorrectWhat outcome counts as correct, including allowed variance. 
CompleteWhich fields, evidence, and actions must be present. 
TimelyThe maximum acceptable response time. 
SafeWhich actions require human approval, or are prohibited. 

KII confirms these four attributes once, and every milestone is measured against them.

Agency MIOSA
Prepared for KII / October 6, 2026

Ninety days, four milestones

From signature to a governed, owned platform, one department at a time.

DAYS 0 TO 10Mobilize (remote)
ON-SITE WEEKOperations audit and install
DAY 30M1 Operations pilot
DAY 45M2 Operations live
DAY 70M3 Second department wave
DAY 90M4 Company rollout and handover
MilestoneDaysWhat is deliveredAcceptanceInvoice
M1 Mobilization and Operations PilotDays 0 to 30NDA and Data Management Plan countersigned, access, environment plan, 30-minute interviews, one on-site week, foundation installed on KII infrastructure, Operations pilot running on mirrored data with human approval gates.Operations pilot runs on mirrored data with approval gates, confirmed in the Friday review.USD 30,000 at signature
M2 Operations LiveDay 45Real users live, Microsoft Teams integration via Microsoft Graph, shared project workspace with session handoff, role and data governance.Accepted with real users working in the system.USD 30,000 on acceptance
M3 Second Department WaveDay 70The second department chosen at kickoff, plus SOP and documentation completion.Department live and SOP accepted.USD 30,000 on acceptance
M4 Company Rollout and HandoverDay 90Remaining in-scope departments, runbooks, admin training, and full source handover in KII's own repository.Handover accepted and admin training complete.USD 30,000 on acceptance
AFTER DAY 90

Accounting migration

A later phase, quoted separately. Accounting is integrated read-only first.

AFTER DAY 90

Deeper agent automation

More agent authority inside the governance model already accepted.

AFTER DAY 90

Other group companies

Optional expansion, under separate agreements and separate scopes.

After Day 90 is not included in the price. It is listed so KII can plan. Weekly rhythm throughout: a Friday review of 30 to 60 minutes, a written weekly status, and recorded decisions.
Agency MIOSA
Prepared for KII / October 6, 2026

Operations first, then the next wave

One department proves the model, then it spreads on evidence.

WAVE ONE / OPERATIONS

Signals, tickets, cases, time billing

Operations runs through the busiest, most measurable work in the company and every step leaves a record. It is the smallest slice that proves governed shared context in real conditions.

DOCUMENTATION COMPLETION PLAN

30 to 40 percent toward complete, in parallel

  • Reuse existing repositories and documentation as they stand.
  • Document the Operations workflow as it is mapped on-site.
  • Move documentation from about 30 to 40 percent toward complete.
  • Company glossary so people and agents use KII's terms.
WAVE TWO / CANDIDATES

Chosen at kickoff

  • Service delivery
  • Sales and client management
  • Administration and finance, excluding accounting migration

The second wave is confirmed in the first Friday review, based on the criteria on the right.

SELECTION CRITERIA
  • Enough real signal volume to test the model.
  • Systems ready enough to mirror read-only.
  • An owner available for the Friday review.
  • A measurable acceptance result.
  • Low disruption risk to live operations.
  • Direct value to the Operations team already live.
Principle: one foundation, then one department at a time. Each wave is accepted before the next begins, so KII always sees a working result before committing more of the organization to it.
WHAT WAVE TWO NEEDS
  • A named owner from the department.
  • Its systems mirrored read-only.
  • Its own representative examples.
  • A first Friday review date.
WHAT STAYS THE SAME
  • One foundation, one governance model, one glossary.
  • The same read-only mirror and human approval gates.
  • The same Friday review rhythm.
  • The same source handover into KII's repository.
Agency MIOSA
Prepared for KII / October 6, 2026

Policy before production data

State the control, then let the platform follow it.

The platform is governed at three levels: user, role, and data. These inputs define the boundary. Agency MIOSA needs each item in writing before production data enters the system.

InputWhat KII providesOwnerNeeded by
Data classificationLevels, labels, and which levels may enter the platform and the mirror. Day 0
Access methodsApproved remote access, network path, and credential handling. Day 0
Model usage policyWhat the internal model on vLLM may handle, and where frontier models are allowed for research only. Day 10
RetentionHow long data is kept, and what is deleted at the end of the engagement. Day 10
Incident contactsNamed contacts and the escalation path for a security incident. Day 0
Client notification requirementsWhen and how KII's clients are told who handles their data. Day 10
Swiss FADP and EU GDPRData residency, subject access, and deletion obligations that apply to KII and its clients. Day 10
Fixed by design: everything runs on-prem in KII's own data center. Operations use the internal model served through vLLM. Data stays on KII infrastructure, and remote access follows KII-approved methods only.
Required before production: the security and data owner approves the access methods, the retention rules, and the model usage policy. Until then, only mirrored data in a controlled environment is used.
GOVERNED AT THE USER LEVEL

Each person signs in with their own identity, and sessions are visible to the team according to role.

GOVERNED AT THE ROLE LEVEL

A role decides what a person may see and do, and which actions need an approval gate.

GOVERNED AT THE DATA LEVEL

Classification decides which records and data levels may enter the mirror and the workspace.

Agency MIOSA
Prepared for KII / October 6, 2026

Readiness and confirmation

Start when the inputs are owned, accessible, and testable.

BEFORE DAY 0
  • SOW signed by both parties
  • NDA and Data Management Plan signed
  • All owners named in the owner table
  • Kickoff date set
BEFORE THE ON-SITE WEEK
  • Access granted for the listed systems
  • Representative Operations examples prepared
  • On-site dates and location confirmed in Zurich
  • Friday review slot set in the calendar
Readiness item
Ready
Owner
Date
SOW signed by both parties
□
 
 
NDA and Data Management Plan signed
□
 
 
Executive sponsor and acceptance authority named
□
 
 
Access granted for the listed systems
□
 
 
Representative Operations examples prepared
□
 
 
On-site week dates and location confirmed
□
 
 
Friday review slot and escalation path set
□
 
 
ConfirmationNameRoleSignatureDate
KII    
Agency MIOSARoberto H. LunaPrincipal Architect and Engagement Lead  
Definition of ready: every critical input has a named owner, an approved access path, and a testable acceptance consequence.